Type Of Enclosure
Original / Photocopy
Attestation Required
Documents Recommended
Completion certificate from a licensed electrical contractor and the work order
Original
Not Required
Completion certificate from a licensed electrical contractor and the work order
List of equipments
Original
Not Required
List of equipments
Permission letter from DISCOM/Transmission company
Original
Not Required
Permission letter from DISCOM/Transmission company
Factory/site test report of Generator
Original
Not Required
Factory/site test report of Generator
CT/PT/ meter test report
Original
Not Required
CT/PT/ meter test report
Manufacturer’s test report of Major equipments
Original
Not Required
Manufacturer’s test report of Major equipments
Site test results of Major equipments
Original
Not Required
Site test results of Major equipments
Transformer(Above 200KVA) Oil test report from STL/NABL accrediated laboratory
Original
Not Required
Transformer(Above 200KVA) Oil test report from STL/NABL accrediated laboratory
Compliance document of last inspection
Original
Not Required
Compliance document of last inspection
Photo ID of the applicant
Original
Not Required
Photo ID of the applicant
Source link